Files
Alexander Kogutkiewicz ac8a9e293b Changed folder naming.
2025-09-21 22:26:43 -05:00

130 lines
6.6 KiB
Markdown

* 6/19 - Jenny forwarded an ExcalTech SLA document [[2025-06-16 ExcalTech SLA.pdf]]
* 6/19 - Bartender was renewed and new licenses issued [[2025-06-05 CDW Bartender Maintenance.pdf]] [[Bartender 2022 Enterprise.pdf]]
* I have the order but not an invoice.
* 7/1 - Jenny shared links on Amcrest camera
* Included IP config tool download and managing devices from desktop
* [ ] Review Amcrest links and utilities
* 7/22 - EUG membership renewed [[23-06-23-inv-eug-membership.pdf]]
* [ ] Find out if I can access EUG membership site
* 7/31 - Jenny shared ransomware response document and cyber liability policy [[Response to Ransomware Attack]] [[Cyber Policy Summary 7-1-24 to 7-1-25.pdf]]
* Cyber policy is outdated.
* [ ] Verify and get updated cyber liability policy.
* [ ] Verify ransomware response is up-to-date (see 8/28 email)
* 8/14 - Jenny sent template "electronic signature" email she sends to users
* 8/18 - Walter lost his key fob access. He is never to be issued a fob again per Adam Neal.
* 8/18 - Jenny shared [[Key Fob Request Workflow]]
* 8/22 - Jenny requested Amazon access
* Setup on 8/26. Access has been established.
* 8/22 - Jenny shared Amazon renewal notice
* alliedplastics.com auto-renews on 9/19/25 for 9 years
* $197.91 (renewal) + privacy ($179.91) = 377.82
* [ ] Check GoDaddy renewal 📅 2025-09-17
* 8/22 - Conversation about mega619 computer hanging
* 8/26 - Information from PTi on connectivity and historical data server
* [ ] Make a note documenting configuration
* 8/26 - Jenny shared information about access control information and contacts
* [ ] Verify access control information and list, make notes
* 8/28 - Jenny contact Ryan Faith at ExcalTech about power outage and procedures
* I was not on the response to this email
* Asked for review of ransomware procedure and VMWare startup/shutdown procedure
* [ ] Add Ryan Faith to ExcalTech contact list
* [ ] Verify documentation of VMWare startup/shutdown procedures
* [ ] Find out if Adam took responsibility for this
* 8/28 - Access granted to Axis Entry (key fob software)
* [ ] Verify Axis access works
* 9/1 - Email from Adam about power outage results
* 9/2 - Jenny sent Adam Neal updated security call list.
* Asked whether to email instructions or hold training.
* Verified on 9/8 that list was updated
* [ ] Find out whether there will be instructions or training on security call list
* [ ] Add Randy Christenson from Toepfer Security to contact list
* 9/3 - Alex Laphond asked about shipping his laptop back
* Jenny asked for her to share information or a label
* Wanted it insured for $1,700
* Lyndsay sent account number and fedex number but nothing more
* [x] Did Alex ever get this information or did it just come to me? ✅ 2025-09-17
* [x] Have we ever received the laptop? ✅ 2025-09-17
* 9/3 - Email from John Paleologos (ExcalTech) about HPE/Aruba switch warranties
* Was still waiting on wrong server warranty dates
* Answered about switch warranty difference
* [ ] Find out what's going on with warranties for HPE/Aruba servers and switches
* 9/3 - Message about Ariba notices going to Tim
* [ ] Verify that Tim has been removed from the email lists
* 9/4 - Instructions on shredding services and workflow
* [ ] Document process along with other shredding notes
* 9/5 - Jenny forwarded [[2025-11-30 Sofos Robotmaster Quote.pdf]
* 9/5 - Microsoft volume licensing admin email
* See notes for additional information
* Did not have licensing access last I checked
* [ ] Verify Microsoft volume licensing access
* 9/5 - Jenny notified Dell account executive about retirement
* [ ] Add Dell account rep Kristina York to contact list
* 9/5 - Kepware Renewal email, quote sent
* [ ] Create tracker for quotes and renewals
* 9/8 - Setup Goengineer account
* [ ] Verify GoEngineer access
* 9/8 - Jenny sent ExcalTech "Organization Adminstrators" email for M365 backup
* [ ] Invitation has expired for ExcelTech link; get a new one
* [ ] Document M365 backup site (and other portals)
* 9/8 - Authorized Abraham shredding invoice
* 9/8 - Jenny requested I add my CC to Ariba
* [ ] Verify my CC is setup in Ariba
* 9/9 - Request to give Nicole her own PC at Wilmot.
* Jenny is pushing back.
* Last I heard, John Highland hadn't made a decision.
* [ ] Find out what's going on with Nicole and Noor at Wilmot/QC
* 9/9 - Jenny forwarded email about Zonedirector
* Said we would discuss
* Renewal will come in January
* Pertains to wireless
* [ ] Follow-up with Jenny on ZoneDirector
* 9/10 - Jenny changed contacts on EUG and James
* 9/10 - Meter reading request from James
* 9/10 - Invoice from Ariba
* 9/10 - Email from John Paleologos on Veeam VUL vs perpetual
* 9/10 - Confirmation I switched to Excal
* 9/11 - Quote from Yodeck
* Authorized same day, placed on CC
* 9/11 - Confirmation of meter readings from James
* 9/11 - Jenny setup Google business account
* 9/11 - Jenny had Tom from Excal do normal maintenance for SSA
* 9/11 - Message about Duo sync issue
* [ ] Check if someone took care of Duo sync issue
* 9/12 - Jenny got notice of #180136. Told Excal to forward future invoices to me.
* 9/12 - Confirmation Jenny renewed Veeam and VMWare
* Veeam with Excal, VMWare w/ CDW
* 9/12 - Jenny ordered new PC for extrusion
* OnLogic Helix 511 Fanless Intel 12th Gen Edge Computer
* Order sent to AP (you were CC'd)
* Shipped on 9/15, will be here 9/23
* [ ] Figure out adding OnLogic purchase to Obsidian
* 9/12 - Introduction from Haley Fillipp @ CDW
* 9/12 - Jenny asked Jon to confirm if Signalfire should removed from Google Analytics
* No response yet
* [ ] Did Jenny get a response from Jon about Signalfire and Google?
* 9-15 - Jenny asked Brian Cushing from PTI about number of network drops
* [ ] Go through PTI information, create project
* 9/15 - Adam installed the Veeam product key on MGMT01
* 9/15 - Broadcom account setup for VMWare
* 9/15 - Jenny renewed renewal information from Broadcom on VMWare
* [ ] Add renewal information to Obsidian for VMWare
* 9/16 - I was verified as license administrator for Veeam
* 9/16 - Jenny had Adam reach out to Computer Electronic Recycling for recycling project
* [ ] Find out where we are on electronics recycling
* [ ] Add Computer Electronics to Obsidian contacts
* 9/16 - Adam organized the gaylord boxes and locations for storage until pickup
* [ ] Add electronics recycling information to notes
* 9/17 - Tom Cannon reached out about getting a webcam and teams setup to broadcast safety training at Wilmot
* [ ] Create project information for remote safety
* 9/17 - Confirmation that Alex Laphond's laptop was returned
#### Tasks Defined Above
```dataview
TASK
FROM ""
WHERE file.path = this.file.path and !completed
SORT due ASC
```