Files
ITManager-Vault/01 Projects/Enhanced Quality/2. Notes/Entering Inspection Results.md
Alexander Kogutkiewicz ac8a9e293b Changed folder naming.
2025-09-21 22:26:43 -05:00

6.9 KiB

Article last updated: September 9, 2025 at 9:56 PM

After you run an inspection, you need to collect inspection information. Use the Inspection Results Entry app to enter and analyze inspection data for parts, operations, resources, equipment, and fixed assets.

Once you adjust the inspection quantity, you then enter inspection results for each item using the configured panel and rules created for the inspection plan and specification defined. From this test data, the application determines if the item has passed or failed. In some cases, the quantity passed and failed returns to the calling process.

You can launch **Inspection Results Entry** from multiple apps or from the main menu directly. In this article, we will inspect the items using the 'Data Collection' app, while you end activity. However, you can launch the 'Inspection Results Entry' app from the 'Main Menu'.
 
 ![[IMG-20250919070126086.png]]
You can launch **Inspection Results Entry** from multiple apps or from the main menu directly. In this article, we ill inspect the items using the 'Data Collection' app.
Before reviewing the steps in this article, look at the 'Data Used in this Article' element below.
collapse:close
title: Data Used in this Article
##### Data Used in this Article
 
1. We a have a job with one operation and material. The material is set to 'Backflush'. The job is for '5' units of part 'DCD-100-SP'.
    
    ![[IMG-20250919070126110.png]]
     
2. The operation in the job's method of manufacture is tied to an inspection plan and specification.
     
    ![[IMG-20250919070126133.png]]
     
1. The specification tied to the operation holds three 'Inspection Attributes'.
     
    ![[IMG-20250919070126173.png]]
     
	> [!info]
	>The 'Results Entry Page ID' field is used for the 'Application Studio' purposes only. Review step #13 in this article to see an example.
	
    
2. We start production using the 'Data Collection' app. Again, the job is for '5' units of part 'DCD-100-SP'.
    
> [!warning]
> The first step in this article will end production activity using the 'Data Collection' app.
  1. In the Data Collection app, select the End Activity button.

    The End Labor Activity panel opens.

    !IMG-20250919070126229.png

  2. In the Current field, we enter 5.

    Remember, the job was for five units of part 'DCD-100-SP'.

    !IMG-20250919070126250.png

  3. Next, in the End Labor Activity panel, we select the Inspection Data button.

    The Inspection Results Entry panel opens.

    !IMG-20250919070126270.png

  4. In the Inspection Results Entry panel, select the Generate Test Set button.

    !IMG-20250919070126289.png

  5. Next, select the Enter Results button.

    The Inspection Results panel opens.

    !IMG-20250919070126307.png

  6. In the Inspection Results panel, enter the results of you inspection.

    !IMG-20250919070126323.png

title: Display order
collapse: close
In this case, we would enter the 'Thickness', 'Width', and 'Tolerance' results. These are the three attributes defined on the specification linked to the job's operation.

![[IMG-20250919070126340.png]]

Notice they display in a specific order. This is based 'Display Order' values entered for each inspection attribute. However, you can switch the display order if required. To do so, rearrange the 'Display Order' number. For example, we want the 'Inspection Results' panel to displays 'Tolerance' first. As a result, we would enter the value of '1' for 'Tolerance'.

![[IMG-20250919070126363.png]]

If we entered inspection results now then the 'Tolerance' column would display first.

![[IMG-20250919070126383.png]]
  1. In the Inspection Results panel, we enter the results and select the OK button to confirm.

    !IMG-20250919070126409.png

    In this case, we enter results using the 'Results' card. However, you can also enter results using the 'Results Entry Detail' button. This would be the case if your 'Results' card includes many columns, so you do not have to scroll do the right to displays all the columns.

title: Results Entry Detail example
collapse: close
##### Results Entry Detail Example

Assume you are entering inspection results and your 'Results' card holds many inspection attributes (columns). Therefore, you select the 'Results Entry Detail' button to enter your inspection results in a single panel.

![[IMG-20250919070126430.png]]
   

As a result of the entries, all '5' items failed inspection.

![[IMG-20250919070126448.png]]
  1. In the Inspection Results Entry panel, select Save.

    !IMG-20250919082644043.png

  2. In the Inspection Results Entry panel, select the Close button.

  3. In the End Labor Activity panel, the quantity of 5 displays in the Non-Conform Qty field.

    !IMG-20250919082650761.png

  4. Finally, select the reason code that specifies why the items failed.

    !IMG-20250919082658426.png

  5. In the End Labor Activity panel, select the OK button to confirm.

  6. You can also configure your inspection result using the Application Studio by selecting the Application Studio command in the Overflow menu.

    !IMG-20250919082702737.png

title: Application Studio example
collapse: close
##### Application Studio

> [!info]
>When you configure you 'Inspection Results Entry' screen and link it to the 'Specification' tied to job's operation then the configured screen displays once you select the 'Enter Results' button in the 'Inspection Results Entry' app.

The 'Inspection Result Entry' configured in the 'Application Studio' app and used in this section has been pre-entered and is just an example. You can configure any other 'Inspection Results Entry' page, based on your requirement.

For example:

1. You select the **Application Studio** command in the **Inspection Results Entry** app.
	
	The **Application Studio** app displays.
	
	![[IMG-20250919082708366.png]]
	
2. Next, we select the **Edit** icon.
	
	![[IMG-20250919082715877.png]]
	
	The configured page displays. However, this is just an example and you can configure any 'Inspection Results Entry' screen.
	
	![[IMG-20250919082721026.png]]
	
3. Open **Properties**.
	
	![[IMG-20250919082724683.png]]
	
4. Define a name. In this example, the name is **Slider.305RTD**.
	
	![[IMG-20250919082734795.png]]
	
5. You then enter the added name to the **Results Entry Page ID** field located in the **Specification** app.
	
	> [!info]
	> Remember, your job operation is linked to this specification.
	
	![[IMG-20250919082744597.png]]
	
6. When you select the **Result Entry** button to enter your inspection results, the configured page displays.
	
	![[IMG-20250919082750141.png]]