First init.
This commit is contained in:
129
1. Projects/1. Active/Manager Role/Email Notes.md
Normal file
129
1. Projects/1. Active/Manager Role/Email Notes.md
Normal file
@@ -0,0 +1,129 @@
|
||||
* 6/19 - Jenny forwarded an ExcalTech SLA document [[2025-06-16 ExcalTech SLA.pdf]]
|
||||
* 6/19 - Bartender was renewed and new licenses issued [[2025-06-05 CDW Bartender Maintenance.pdf]] [[Bartender 2022 Enterprise.pdf]]
|
||||
* I have the order but not an invoice.
|
||||
* 7/1 - Jenny shared links on Amcrest camera
|
||||
* Included IP config tool download and managing devices from desktop
|
||||
* [ ] Review Amcrest links and utilities
|
||||
* 7/22 - EUG membership renewed [[23-06-23-inv-eug-membership.pdf]]
|
||||
* [ ] Find out if I can access EUG membership site
|
||||
* 7/31 - Jenny shared ransomware response document and cyber liability policy [[Response to Ransomware Attack]] [[Cyber Policy Summary 7-1-24 to 7-1-25.pdf]]
|
||||
* Cyber policy is outdated.
|
||||
* [ ] Verify and get updated cyber liability policy.
|
||||
* [ ] Verify ransomware response is up-to-date (see 8/28 email)
|
||||
* 8/14 - Jenny sent template "electronic signature" email she sends to users
|
||||
* 8/18 - Walter lost his key fob access. He is never to be issued a fob again per Adam Neal.
|
||||
* 8/18 - Jenny shared [[Key Fob Request Workflow]]
|
||||
* 8/22 - Jenny requested Amazon access
|
||||
* Setup on 8/26. Access has been established.
|
||||
* 8/22 - Jenny shared Amazon renewal notice
|
||||
* alliedplastics.com auto-renews on 9/19/25 for 9 years
|
||||
* $197.91 (renewal) + privacy ($179.91) = 377.82
|
||||
* [ ] Check GoDaddy renewal 📅 2025-09-17
|
||||
* 8/22 - Conversation about mega619 computer hanging
|
||||
* 8/26 - Information from PTi on connectivity and historical data server
|
||||
* [ ] Make a note documenting configuration
|
||||
* 8/26 - Jenny shared information about access control information and contacts
|
||||
* [ ] Verify access control information and list, make notes
|
||||
* 8/28 - Jenny contact Ryan Faith at ExcalTech about power outage and procedures
|
||||
* I was not on the response to this email
|
||||
* Asked for review of ransomware procedure and VMWare startup/shutdown procedure
|
||||
* [ ] Add Ryan Faith to ExcalTech contact list
|
||||
* [ ] Verify documentation of VMWare startup/shutdown procedures
|
||||
* [ ] Find out if Adam took responsibility for this
|
||||
* 8/28 - Access granted to Axis Entry (key fob software)
|
||||
* [ ] Verify Axis access works
|
||||
* 9/1 - Email from Adam about power outage results
|
||||
* 9/2 - Jenny sent Adam Neal updated security call list.
|
||||
* Asked whether to email instructions or hold training.
|
||||
* Verified on 9/8 that list was updated
|
||||
* [ ] Find out whether there will be instructions or training on security call list
|
||||
* [ ] Add Randy Christenson from Toepfer Security to contact list
|
||||
* 9/3 - Alex Laphond asked about shipping his laptop back
|
||||
* Jenny asked for her to share information or a label
|
||||
* Wanted it insured for $1,700
|
||||
* Lyndsay sent account number and fedex number but nothing more
|
||||
* [x] Did Alex ever get this information or did it just come to me? ✅ 2025-09-17
|
||||
* [x] Have we ever received the laptop? ✅ 2025-09-17
|
||||
* 9/3 - Email from John Paleologos (ExcalTech) about HPE/Aruba switch warranties
|
||||
* Was still waiting on wrong server warranty dates
|
||||
* Answered about switch warranty difference
|
||||
* [ ] Find out what's going on with warranties for HPE/Aruba servers and switches
|
||||
* 9/3 - Message about Ariba notices going to Tim
|
||||
* [ ] Verify that Tim has been removed from the email lists
|
||||
* 9/4 - Instructions on shredding services and workflow
|
||||
* [ ] Document process along with other shredding notes
|
||||
* 9/5 - Jenny forwarded [[2025-11-30 Sofos Robotmaster Quote.pdf]
|
||||
* 9/5 - Microsoft volume licensing admin email
|
||||
* See notes for additional information
|
||||
* Did not have licensing access last I checked
|
||||
* [ ] Verify Microsoft volume licensing access
|
||||
* 9/5 - Jenny notified Dell account executive about retirement
|
||||
* [ ] Add Dell account rep Kristina York to contact list
|
||||
* 9/5 - Kepware Renewal email, quote sent
|
||||
* [ ] Create tracker for quotes and renewals
|
||||
* 9/8 - Setup Goengineer account
|
||||
* [ ] Verify GoEngineer access
|
||||
* 9/8 - Jenny sent ExcalTech "Organization Adminstrators" email for M365 backup
|
||||
* [ ] Invitation has expired for ExcelTech link; get a new one
|
||||
* [ ] Document M365 backup site (and other portals)
|
||||
* 9/8 - Authorized Abraham shredding invoice
|
||||
* 9/8 - Jenny requested I add my CC to Ariba
|
||||
* [ ] Verify my CC is setup in Ariba
|
||||
* 9/9 - Request to give Nicole her own PC at Wilmot.
|
||||
* Jenny is pushing back.
|
||||
* Last I heard, John Highland hadn't made a decision.
|
||||
* [ ] Find out what's going on with Nicole and Noor at Wilmot/QC
|
||||
* 9/9 - Jenny forwarded email about Zonedirector
|
||||
* Said we would discuss
|
||||
* Renewal will come in January
|
||||
* Pertains to wireless
|
||||
* [ ] Follow-up with Jenny on ZoneDirector
|
||||
* 9/10 - Jenny changed contacts on EUG and James
|
||||
* 9/10 - Meter reading request from James
|
||||
* 9/10 - Invoice from Ariba
|
||||
* 9/10 - Email from John Paleologos on Veeam VUL vs perpetual
|
||||
* 9/10 - Confirmation I switched to Excal
|
||||
* 9/11 - Quote from Yodeck
|
||||
* Authorized same day, placed on CC
|
||||
* 9/11 - Confirmation of meter readings from James
|
||||
* 9/11 - Jenny setup Google business account
|
||||
* 9/11 - Jenny had Tom from Excal do normal maintenance for SSA
|
||||
* 9/11 - Message about Duo sync issue
|
||||
* [ ] Check if someone took care of Duo sync issue
|
||||
* 9/12 - Jenny got notice of #180136. Told Excal to forward future invoices to me.
|
||||
* 9/12 - Confirmation Jenny renewed Veeam and VMWare
|
||||
* Veeam with Excal, VMWare w/ CDW
|
||||
* 9/12 - Jenny ordered new PC for extrusion
|
||||
* OnLogic Helix 511 Fanless Intel 12th Gen Edge Computer
|
||||
* Order sent to AP (you were CC'd)
|
||||
* Shipped on 9/15, will be here 9/23
|
||||
* [ ] Figure out adding OnLogic purchase to Obsidian
|
||||
* 9/12 - Introduction from Haley Fillipp @ CDW
|
||||
* 9/12 - Jenny asked Jon to confirm if Signalfire should removed from Google Analytics
|
||||
* No response yet
|
||||
* [ ] Did Jenny get a response from Jon about Signalfire and Google?
|
||||
* 9-15 - Jenny asked Brian Cushing from PTI about number of network drops
|
||||
* [ ] Go through PTI information, create project
|
||||
* 9/15 - Adam installed the Veeam product key on MGMT01
|
||||
* 9/15 - Broadcom account setup for VMWare
|
||||
* 9/15 - Jenny renewed renewal information from Broadcom on VMWare
|
||||
* [ ] Add renewal information to Obsidian for VMWare
|
||||
* 9/16 - I was verified as license administrator for Veeam
|
||||
* 9/16 - Jenny had Adam reach out to Computer Electronic Recycling for recycling project
|
||||
* [ ] Find out where we are on electronics recycling
|
||||
* [ ] Add Computer Electronics to Obsidian contacts
|
||||
* 9/16 - Adam organized the gaylord boxes and locations for storage until pickup
|
||||
* [ ] Add electronics recycling information to notes
|
||||
* 9/17 - Tom Cannon reached out about getting a webcam and teams setup to broadcast safety training at Wilmot
|
||||
* [ ] Create project information for remote safety
|
||||
* 9/17 - Confirmation that Alex Laphond's laptop was returned
|
||||
|
||||
|
||||
#### Tasks Defined Above
|
||||
```dataview
|
||||
TASK
|
||||
FROM ""
|
||||
WHERE file.path = this.file.path and !completed
|
||||
SORT due ASC
|
||||
```
|
||||
|
||||
Reference in New Issue
Block a user